HOLLYWOOD STATION - H3 - CONSTRUCTION PROGRESSW



CONSTRUCTION UPDATE


January 2016

This month, 7th floor has been reached.






Construction Progress as of January 13, 2016

 

The decking for the 8th floor is starting now.

 

 

 

 Construction Progress as of January 20th, 2016

 

 

Hollywood Station - H3

 


A new development in Downtown Hollywood 


 1, 2 and 3 bedroom residences



Starting at the mid- $200’s

 

 

 

 

H3 at Hollywood Station RESIDENCE FEATURES:
Unique loft spaces
12 foot ceilings  
Pre-wired for telephone/satellite & high speed internet   
Impact resistant Windows
Spacious balconies and terraces 
Individual storage spaces  
Individual roof top A/C unit

H3 at Hollywood Stations Amenities 




Pool
Fitness Center
Club House  
Security
Valet Parking
Business Center/ Conference Room
Front Desk24 hour guard
Elevator
Jogging PathPark

 

For more information or reservations

please call 

HENRY B. NATHAN

United Realty Group Inc,

(800) 416-2747

(954) 296-6741

 

or visit my websites:

 

miami-new-construction.com/portfolio/h3-at-hollywood-station/ 

 

condo-southflorida.com 

 

golden-beach-homes.com 

 

goldenisles-homes.com 

 

Wednesday, December 09, 2015

HOLLYWOOD STATION NEW CONSTRUCTION - HOLLYWOOD -




H3 at HOLLYWOOD STATION


CONSTRUCTION REPORT    -  December 2015   -  

Direct News from the Developers

 


•This month we have pushed through the 3rd floor, as well as the 4th floor. We are now doing the 4th floor mezzanine deck and the decking for the 5th floor is beginning. This includes all columns and shear walls as well as the slabs themselves.

 



•Stripping has begun on the 5th floor (columns, shear walls, stairwells and slabs).

 

 



 

•Plumber, sprinkler contractor and mechanical contractor are installing all sleeves.

 



•Electrical contractor is running all pipes in slab and columns, and installing power and lighting boxes in slabs and columns.

 



•Block mason is laying  blocks on ground floor and will begin filling back ground slab.

 



•Glazing contractor is working on layout and templates for glass and balcony railing installation for block outs as we prepare to pour the slabs.

 